Real Estate & Construction

+90 532 588 62 55 [email protected]
Currency

P1264 Project Mahmutlar Alanya

Details

FLATS FOR SALE IN ALANYA MAHMUTLAR

FLATS FOR SALE IN ALANYA MAHMUTLAR

Exodus Hill Residence is located in Mahmutlar, the most dynamically developing area of ​​Alanya, surrounded by nature. Exodus Hill is located on the same level as the famous Azura Park complex and right next to the first complex of the Exodus line – Exodus Residence Mahmutlar. The residential complex Exodus Hill consists of two 12-story blocks and a total of 144 flats.

In the complex:

Apartments 1 + 1, 51 m2 area;
apartments 2 + 1, 70 m2;
Duplexes ranging from 100m2 to 105m2 2 + 1
Duplexes ranging from 112m2 to 123m2 are 3 + 1.
duplexes 4 + 1, 149 m2.

At this stage of construction, it is possible to combine several apartments in one apartment, according to your individual wishes and preferences.

The infrastructure of the residential complex Exodus Hill Residence includes an outdoor swimming pool, heated indoor pool, steam room, Turkish bath, massage rooms, gym (fitness), relaxation SPA area, cinema, cafeteria and mini bar, pool bar, children’s room, children’s playroom playground, mini club, electric generator, free WIFI throughout the residential complex, video surveillance system, attendant, free shuttle to/from the beach several times a day.

Exodus Hill Residence is located just 1800 meters from the sea and 30 kilometers from Alanya International Airport (Gazipaşa). Mahmutlar region is one of the most popular regions for foreigners in Alanya, where active and dynamic life does not stop all year round.

Private apartment cost in the first stage of construction:

-We offer apartments 1 + 1 for prices starting from 41.000 €. We offer apartments for sale with prices starting from 2 + 1 55.000 €.
-We offer duplex 2 + 1 for sale with prices starting from 79.000 € -We offer duplex 3 + 1 for sale with prices starting from 95.000 € We offer duplex 4 + 1 for sale with prices starting from 115.000 €.

Within the framework of the project, we have interest-free payment options in installments until the end of the construction. Construction starts in January 2021.

Construction completion: May 2022.